Construction-Manager-at-Risk brings the construction manager on board during design as an advisor, then converts to a guaranteed maximum price (GMP) to build. These Articles cover the model and its preconstruction role, qualifications-based CM selection and the GMP process, GMP contingency and risk allocation, when to use it and its trade-offs, and healthcare-specific factors like phasing, long-lead equipment, and occupied-campus work.

GMP, Contingency & Risk Allocation

Healthcare-Specific Considerations (Phasing, Long-Lead, Occupied-Campus)

Model Overview & Preconstruction Role

Qualifications-Based CM Selection & GMP Process

When to Use & Trade-Offs